TEL: +86-755-27997526
Categories
Contact Us
Shenzhen Xinchanglong New Material Technology Co.,Ltd
Add: A Building,No.114 Xiangxi Xinwei, Songyuanxia Community, Guanlan Street, Longhua New District, Shenzhen
Tel: +86-755-27997526
Fax:+86-755-23063739
Mob:+86-18928450189
E-mail: sales@gl-polygel.com
News
Home > News > Content
Brazil-Argentina Submarine Cable System Is Scheduled To Put Into Production In Mid-2020
Aug 01, 2018

GlobeNet, an expert in international network connectivity and infrastructure services, revealed that it plans to expand its communications network in Latin America through a submarine cable system connecting Brazil and Argentina.filling compound for cable

图片1.png

It is reported that the submarine cable system will connect Rio de Janeiro, Brazil and Buenos Aires, the capital of Argentina, for a total length of about 2,500 kilometers.


The system will consist of four pairs of fibers with an initial maximum design capacity of 44 Tbps. In addition, the submarine cable landing station will be connected to Brazil's existing Seabras-1 cable, allowing direct connection to New York (USA) via the fully operational Seabras-1 submarine cable system.hot application filling compound


According to the plan, the Brazilian-Argentine submarine cable system will be put into use in 2020.filling gel for fiber optic cable


  • Contact Us
    Shenzhen Xinchanglong New Material Technology Co.,Ltd
    Add: A Building,No.114 Xiangxi Xinwei, Songyuanxia Community, Guanlan Street, Longhua New District, Shenzhen
    Tel: +86-755-27997526
    Fax:+86-755-23063739
    Mob:+86-18928450189
    E-mail: sales@gl-polygel.com
  • Categories
  • Copyright © Shenzhen Xinchanglong New Material Technology Co.,Ltd. All Rights Reserved.