TEL: +86-755-27997526
Categories
Contact Us
Shenzhen Xinchanglong New Material Technology Co.,Ltd
Add: A Building,No.114 Xiangxi Xinwei, Songyuanxia Community, Guanlan Street, Longhua New District, Shenzhen
Tel: +86-755-27997526
Fax:+86-755-23063739
Mob:+86-18928450189
E-mail: sales@gl-polygel.com
News
Home > News > Content
Africa Submarine Cable System Kenya Section LION2 Failure
Oct 17, 2018

According to Emtel, a Malaysian telecommunications company, the Indian Ocean submarine cable system No. 2, LION2, has been malfunctioning 8-9 km from the Kenyan coast.

image

According to preliminary investigations, offshore operations are the cause of the failure of the LION2 submarine cable system.


At present, Emtel has dispatched engineers to the fault location for repairs. Therefore, there may be a drop in network speed during peak operations.


Emtel also said that it has planned to purchase additional capacity to alleviate this problem.


The 2,700-kilometer-long LION2 submarine cable system was connected to Mayotte and Kenya in April 2012 through the Certification Readiness Service (RFS).


  • Contact Us
    Shenzhen Xinchanglong New Material Technology Co.,Ltd
    Add: A Building,No.114 Xiangxi Xinwei, Songyuanxia Community, Guanlan Street, Longhua New District, Shenzhen
    Tel: +86-755-27997526
    Fax:+86-755-23063739
    Mob:+86-18928450189
    E-mail: sales@gl-polygel.com
  • Categories
  • Copyright © Shenzhen Xinchanglong New Material Technology Co.,Ltd. All Rights Reserved.